Must Read

JNPT signs MoU with CIDCO for development of infrastructure for Project Affected People

By IndianMandarins- 20 Jan 2021
1827

jnpt-signs-mou-with-cidco-for-development-of-infrastructure-for-project-affected-people

Mumbai (20.01.2021): Jawaharlal Nehru Port Trust (JNPT), India’s premier container port, on Wednesday, announced that it signed a Memorandum of Understanding (MoU) with City and Industrial Development Corporation (CIDCO) for allotment of land under the 12.5% scheme to JNPT Project Affected Persons (PAPs). The MoU was signed by Sanjay Sethi (IAS) Chairman, JNPT in presence of Unmesh Sharad Wagh (IRS), Deputy Chairman, JNPT and by Sanjay Mukherjee (IAS) Vice Chairman & Managing Director, CIDCO.

The Ministry of Ports, Shipping and Waterways on 23rd May 2019 had conveyed its approval for the proposal of JNPT for development of basic infrastructure of land to be allotted under 12.5% scheme of Government of Maharashtra to JNPT PAP’s by CIDCO at JNPT at a maximum cost of Rs. 376.20 crore.

As per the MoU, JNPT will transfer over 111 hectares of JNPT land to the State Government for allotment of land to the project affected persons and CIDCO has agreed for the PMC charges at 5% of the project cost. The MoU states that JNPT would pay CIDCO, the actual amount incurred by CIDCO towards cost of development of the said land. CIDCO has agreed to complete the entire work within 36 months.

In addition to transferring the said 111 hectares of the JNPT land, CIDCO will develop the required amenities and infrastructure as per the finalized layout which will be allotted to the JNPT PAPs. JNPT will release the funds in installments based on the actual utilization certificate issued by CIDCO from time to time. It has also been agreed that till the infrastructure is handed over to local authority, CIDCO will be special planning authority for the area and the cost of maintenance of the infrastructure will be borne by CIDCO. Since the project is being funded by JNPT, the Government of Maharashtra has authorized CIDCO to execute this MoU and CIDCO shall pass on the development charges from the PAPs to JNPT. 

The allotment of land has been made transparent where CIDCO in coordination with JNPT has conducted five draws of lots through a computerized lottery system and so far 52% PAPs have been issued a letter of intent by CIDCO. JNPT firmly believes, the remaining 48% PAPs will soon participate in the transformation.

free stat counter